STAGE 05 OF 07
Threading
Loose threads trimmed and every seam inspected for a clean finish.
Every stitched garment passes through threading, where loose thread ends are trimmed by hand and seams are inspected up close. This is our second quality checkpoint — anything missed at stitching gets caught here.
Loose threads trimmed by hand
Seams inspected up close
Any stitching issues flagged and corrected
Garment cleared to move to pressing
5 of 7
Inspect & Trim
Seams & Finish
ISO 9001 · BSCI · OEKO-TEX · GRS
Tools & Techniques at This Stage
Hand Trimming
Loose thread ends cut away by hand, garment by garment.
Seam Inspection
Every seam checked up close before the garment moves on.
Defect Flagging
Anything caught here is corrected before pressing.
Clearance
Garment signed off before it proceeds to the next stage.
Common Questions, Answered
Is this the only quality check before shipping?
No — it's the second of four checkpoints. Stitching, threading, pressing, and packing each include an inspection.
What happens if a defect is caught here?
It's tracked and corrected before that piece continues — the same process referenced on our Quality Control page.
Does this add extra time to my order?
No — it's a standard part of every order's timeline, already built into our 14–15 working day bulk production window.
Do you document what's inspected?
Yes — a quality report covering all four checkpoints is available for your review before your order ships.
>